Construction data

AP-41 Construction Units

Earthworks
Topsoil 1.658.000 m3
Site clearings 12.430.000 m3
Scalings 950.000 m3
S-ST1 and 2 stabilised soil 1.240.000 m3
Drainage
1800 pipe outlet type drainage 3.850 ml
Frame type drainage 670 ml
Vault type drainage 350 ml
Pavement
Cement floor 475.000 m3
Asphalt mix 760.000 Tn.
Structures
Viaducts 10 uds
Underpasses 34 uds
Overpasses 48 uds
Signals, traffic guidance equipment and defences
Safety barrier 127.590 ml